SHORTLIST EVALUATION FORMS
Forms used to evaluate qualifications of design teams and general contractors submitting qualifications for work. Each selection committee member completes one of these forms for each SOQ submitted.
> design services shortlist evaluation
> construction services shortlist evaluation

--start copy here-->
March 18, 2023
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to submit a proposal for the general contract for all labor, material, and equipment necessary for the Chemical Vapor Deposition Laboratory reactor installation. The laboratory is located in the Engineering Research Center, a building at the Arkansas Research and Technology Park. The bids shall be on a lump sum basis. An optional pre-bid conference will be held at 10:00am local time on April 4, 2023 at Facilities Management, Main Conference Room, 521 S. Razorback Road, Fayetteville, AR. The Owner will receive sealed proposals until 2:00pm local time on April 18, 2023.
> invitation to bid

March 17, 2023
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Bud Walton Arena renovation. The deadline for responses is 1:00pm local time on Thursday, April 6, 2023.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the Bud Walton Arena renovation. The deadline for responses is 1:00pm local time on Thursday, April 6, 2023.
> request for qualifications

February 24, 2023
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, March 14, 2023
> request for qualifications
NOTICE TO CIVIL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified civil engineers for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, March 14, 2023.
> request for qualifications

December 16, 2022
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Biology Greenhouse expansion. The deadline for responses is 1:00pm local time on Tuesday, January 10, 2022.
> request for qualifications

October 28, 2022
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Yocum Hall renovation. The deadline for responses is 1:00pm local time on Thursday, November 17, 2022.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the Yocum Hall renovation. The deadline for responses is 1:00pm local time on Thursday, November 17, 2022.
> request for qualifications

October 14, 2022
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Reid Hall window replacement. The deadline for responses is 1:00pm local time on Tuesday, November 1, 2022.
> request for qualifications
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Arkansas Union interior fit out for student organizations. The deadline for responses is 1:00pm local time on Tuesday, November 1, 2022.
> request for qualifications
> supplemental information - study 1
> supplemental information - study 2
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the Arkansas Union interior fit out for student organizations. The deadline for responses is 1:00pm local time on Tuesday, November 1, 2022.
> request for qualifications

September 24, 2022
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for construction of Senior Walk 2021-2025. The bids shall be on a lump sum basis. An optional pre-bid conference will be held at 9:00am local time on Wednesday, October 5, 2022 at Facilities Management, Main Conference Room, 521 S. Razorback Road, Fayetteville, AR. The Owner will receive sealed proposals until 2:00pm local time on Tuesday, October 18, 2022.
> invitation to bid

July 16, 2022
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to submit a proposal for the general contract for the construction of the Engineering Research Center reroof, located at 700 W Research Center Blvd, Fayetteville, AR. The bids shall be on a lump sum basis. An optional pre-bid conference will be held at 10:00am local time on Tuesday, August 2, 2022 at the Engineering Research Center, Room 1161 (AT&T Conference Room), 700 W
Research Center Blvd, Fayetteville, AR. The Owner will receive sealed proposals until 2:00pm local time on Tuesday, August 16, 2022.
> invitation to bid

June 18, 2022
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Razorback Field fieldhouse. The deadline for responses is 1:00pm local time on Wednesday, July 6, 2022.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the Razorback Field fieldhouse. The deadline for responses is 1:00pm local time on Wednesday, July 6, 2022.
> request for qualifications
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Bogle Park renovation and expansion. The deadline for responses is 1:00pm local time on Wednesday, July 6, 2022.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the Bogle Park renovation and expansion. The deadline for responses is 1:00pm local time on Wednesday, July 6, 2022.
> request for qualifications

April 29, 2022
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Sam M. Walton College of Business space use and physical development study. The deadline for responses is 1:00pm local time on Tuesday, May 24, 2022.
> request for qualifications

March 26, 2022
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide Job Order Contracting (JOC) services. A voluntary pre-proposal meeting will be held at 2:00pm local time on Wednesday, April 6, 2022. This meeting will be held via the web. Proposals shall be submitted no later than 2:00pm local time, on Tuesday, April 19, 2022.
> request for proposal
> addendum 1

February 11, 2022
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, March 1, 2022.
> request for qualifications
NOTICE TO CIVIL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified civil engineers for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, March 1, 2022.
> request for qualifications
NOTICE TO GEOTECHNICAL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified geotechnical engineers for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, March 1, 2022.
> request for qualifications

October 29, 2021
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for Mullins Library renovation floors 1 and 2. The deadline for responses is 1:00pm local time on Tuesday, November 16, 2021.
> request for qualifications
> supplemental information - project timeline
> supplemental information - study
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for Mullins Library renovation floors 1 and 2. The deadline for responses is 1:00pm local time on Tuesday, November 16, 2021.
> request for qualifications

September 17, 2021
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for a planning, scope, and budget study for the Multi-User Silicon Carbide National Research Fabrication Laboratory (MUSiC Lab). The deadline for responses is 1:00pm local time on Thursday, October 7, 2021.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for a planning, scope, and budget study for the Multi-User Silicon Carbide National Research Fabrication Laboratory (MUSiC Lab). The deadline for responses is 1:00pm local time on Thursday, October 7, 2021.
> request for qualifications

September 10, 2021
NOTICE TO ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified engineers for the HEERF ventilation improvements. The deadline for responses is 1:00pm local time on Thursday, September 30, 2021.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the HEERF ventilation improvements. The deadline for responses is 1:00pm local time on Thursday, September 30, 2021.
> request for qualifications

August 27, 2021
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Windgate Galleries. The deadline for responses is 1:00pm local time on Tuesday, September 21, 2021.
> request for qualifications
> supplemental information - study
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the Windgate Galleries. The deadline for responses is 1:00pm local time on Tuesday, September 21, 2021.
> request for qualifications

August 20, 2021
NOTICE TO LANDSCAPE ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified landscape architects for Senior Walk 2021-2025. The deadline for responses is 1:00pm local time on Tuesday, September 7, 2021.
> request for qualifications

August 14, 2021
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to submit a proposal for the general contract for the exterior restoration of White Engineering Hall, a Collegiate Gothic building located in the historic core of campus. The bids shall be on a lump sum basis. An optional virtual pre-bid conference will be held at 9:00am local time on August 26, 2021 . The Owner will receive sealed proposals until 2:00pm local time on September 7, 2021.
> invitation to bid
> addendum 1

June 25, 2021
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Engineering Research Center reroof. The deadline for responses is 1:00pm local time on Tuesday, July 13, 2021.
> request for qualifications
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Nanoscale Material Science and Engineering Building clean room fit out. The deadline for responses is 1:00pm local time on Tuesday, July 13, 2021.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the Nanoscale Material Science and Engineering Building clean room fit out. The deadline for responses is 1:00pm local time on Tuesday, July 13, 2021.
> request for qualifications

May 22, 2021
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for the Arkansas Union tenant infill, an interior space located on the second and third floors of the Arkansas Union. The bids shall be on a lump sum basis. An optional pre-bid conference will be held at 10:00am local time on June 4, 2021 via an online conference call. The Owner will receive bids until 2:00pm local time on June 25, 2021.
> invitation to bid

April 2, 2021
NOTICE TO FIRE ALARM AND SECURITY VENDORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified vendors to furnish labor and materials for Fire Alarm, Access Control, Video Surveillance, and Intrusion Detection Systems under an Indefinite Delivery Indefinite Quantity (IDIQ) contract for new construction and renovation projects. An optional pre-proposal conference will be held at 10:00am local time on Tuesday, April 20, 2021 via an online conference call. The Owner will receive sealed proposals until 2:00pm on Tuesday, April 27, 2021.
> request for proposals
> supporting information
> addendum 1

March 26, 2021
NOTICE TO VENDORS FOR TESTING, ADJUSTING, AND BALANCING HVAC SYSTEMS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified vendors to furnish Testing, Adjusting, and Balancing HVAC systems and complete fume hood testing under an Indefinite Delivery Indefinite Quantity (IDIQ) contract for new construction and renovation projects. An optional pre-proposal conference will be held at 11:00am local time on Tuesday, April 6, 2021 via an online conference call. The Owner will receive sealed proposals until 1:00pm on Tuesday, April 20, 2021.
> request for proposals
> addendum 1
NOTICE TO VENDORS FOR ASSESSMENT, CLEANING, AND RESTORATION OF HVAC SYSTEMS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified vendors to furnish Assessment, Cleaning, and Restoration of HVAC systems under an Indefinite Delivery Indefinite Quantity (IDIQ) contract for new construction and renovation projects. An optional pre-proposal conference will be held at 10:00am local time on Tuesday, April 6, 2021 via an online conference call. The Owner will receive sealed proposals until 1:00pm on Tuesday, April 20, 2021.
> request for proposals
> addendum 1

December 11, 2020
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, January 5, 2021.
> request for qualifications
NOTICE TO COMMISSIONING ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified commissioning engineers for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, January 5, 2021.
> request for qualifications
NOTICE TO ENVIRONMENTAL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified environmental engineers for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, January 5, 2021.
> request for qualifications
NOTICE TO GEOTECHNICAL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified geotechnical engineers for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, January 5, 2021.
> request for qualifications
NOTICE TO MECHANICAL—ELECTRICAL—PLUMBING ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified mechanical-electrical-plumbing engineers for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, January 5, 2021.
> request for qualifications

October 17, 2020
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for the Epley Center for Health Professions mechanical system replacement, located on N Razorback Rd. The bids shall be on a lump sum basis. An optional pre-bid conference will be held at 10:00am local time on October 27 via a Microsoft Teams conference call. The Owner will receive bids until 2:00pm local time on November 10, 2020 .
> invitation to bid

June 12, 2020
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects to provide professional design services for the Fine Arts Center restoration. The deadline for responses is 1:00pm local time on Wednesday, July 1, 2020.
> request for qualifications
> supplemental information 1
> supplemental information 2
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the Fine Arts Center restoration. The deadline for responses is 1:00pm local time on Wednesday, July 1, 2020.
> request for qualifications

May 23, 2020
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for the Global Campus first floor renovation, in a University of Arkansas building located at the northeast corner of the Fayetteville town square. The bids shall be on a lump sum basis. A pre-bid conference will be held at 9:00am local time on June 11, 2020 via a Microsoft Teams conference call. The Owner will receive bids until 2:00pm local time on June 23, 2020.
> invitation to bid
> addendum 1
> addendum 2
> addendum 3

March 07, 2020
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for the Arkansas Union tenant infill, an interior space located on the second and third floors of the Arkansas Union. The bids shall be on a lump sum basis. A pre-bid conference will be held at 10:00am local time on March 18, 2020 at Facilities Management, Main Conference Room, 521 S. Razorback Road, Fayetteville, AR. The Owner will receive bids until 2:00pm local time on April 14, 2020.
> invitation to bid
> addendum 1
> addendum 2
> addendum 3
> addendum 4

February 29, 2020
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for the South Campus Steam System Improvements—Phase II.
located at the University of Arkansas Fayetteville. The bids shall be on a lump sum basis. A pre-bid conference will be held at 10:00am local time on March 12, 2020 at Facilities Management, Main Conference Room, 521 S. Razorback Road, Fayetteville, AR. The Owner will receive bids until 2:00pm local time on March 26, 2020.
Update: Kinco Constructors (Springdale and Little Rock, AR) was the successful bidder.
> invitation to bid

February 28, 2020
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the Anthony Timberlands Center for Design and Materials Innovation. The deadline for responses is 1:00pm local time on Tuesday, March 17, 2020.
Update: The Board of Trustees selected Nabholz Construction Services (Rogers and Conway, AR) for this contract at its meeting on May 21, 2020.
> request for qualifications

February 15, 2020
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for the construction of the Central Utility Plant Shop and Power Center located near Williams Street. The bids shall be on a lump sum basis. A pre-bid conference will be held at 10:00am local time on February 27, 2020 at Facilities Management, Main Conference Room, 521 S. Razorback Road, Fayetteville, AR. The Owner will receive bids until 2:00pm local time on March 10, 2020.
Update: C.R. Crawford Construction (Fayetteville, AR) was the successful bidder.
> invitation to bid

January 31, 2020
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for a planning, scope, and budget study for the Institute for Integrative and Innovative Research. The deadline for responses is 1:00pm local time on Friday, February 14, 2020.
Update: The Board of Trustees selected Hufft (Bentonville, AR) with HGA (Boston, MA) for this contract at its meeting on March 19, 2020.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for a planning, scope, and budget study for the Institute for Integrative and Innovative Research. The deadline for responses is 1:00pm local time on Friday, February 14, 2020.
Update: The Board of Trustees selected CDI Contractors LLC (Fayetteville, Little Rock AR) for this contract at its meeting on March 19, 2020.
> request for qualifications

January 11, 2020
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for the construction of University of Arkansas Animal Facility (CLAF) located 700 Research Center Boulevard, Fayetteville, AR. The bids shall be on a lump sum basis. A pre-bid conference will be held at 10:00 am local time on January 22nd, 2020 at the project site. The Owner will receive bids until 2:00 pm local time, on February 4th, 2020.
Update: Flintco Constructive Solutions (Springdale, AR) was the successful bidder.
> invitation to bid
> addendum 1
> addendum 2
> addendum 3
> addendum 4

December 13, 2019
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Health, Physical Education, and Recreation Building second floor renovation. The deadline for responses is 1:00pm local time on Wednesday, January 8, 2020.
Update: The Board of Trustees selected Hufft (Bentonville, AR) with SmithGroup (Dallas, TX) for this contract at its meeting on March 19, 2020.
> request for qualifications
> supplemental information - feasibility study
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the Health, Physical Education, and Recreation Building second floor renovation. The deadline for responses is 1:00pm local time on Wednesday, January 8, 2020.
Update: The Board of Trustees selected C.R. Crawford Construction (Fayetteville, AR) for this contract at its meeting on March 19, 2020.
> request for qualifications

November 22, 2019
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, December 10, 2019.
Update: The Board of Trustees selected modus studio (Fayetteville, AR) for this contract at its meeting on March 19, 2020.
> request for qualifications
NOTICE TO MECHANICAL—ELECTRICAL—PLUMBING ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified mechanical—electrical—plumbing (MEP) engineers for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, December 10, 2019.
Update: The Board of Trustees selected Bernhard TME (Fayetteville, AR), Pettit and Pettit (Little Rock, AR) and Henderson Engineers, Inc. (Bentonville, AR) for this contract at its meeting on March 19, 2020.
> request for qualifications
NOTICE TO COMMISSIONING ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified engineers to provide building commissioning services. The deadline for responses in 1:00pm local time on Tuesday, December 10, 2019.
Update: The Board of Trustees selected Bernhard TME (Fayetteville, AR), Pinnacle Energy Services (Fayetteville, AR) and Cromwell Energy Services (Little Rock, AR) for this contract at its meeting on March 19, 2020.
> request for qualifications

October 25, 2019
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide professional design services for the Brough Commons retail shops renovation. The deadline for responses is 1:00 PM local time on Tuesday, November 12, 2019.
Update: The Board of Trustees selected HFA (Bentonville, AR) for this contract at its meeting on March 19, 2020.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the Brough Commons retail shops renovation. The deadline for responses is 1:00 PM local time on Tuesday, November 12, 2019.
Update: The Board of Trustees selected Flintco Constructive Solutions (Springdale, AR) for this contract at its meeting on March 19, 2020.
> request for qualifications

October 4, 2019
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide professional design services for the Anthony Timberlands Center for Design and Materials Innovation. The deadline for responses is 1:00 PM local time on Tuesday, October 29, 2019.
Update: The Board of Trustees selected Grafton Architects (Dublin, Ireland) with modus studio (Fayetteville, AR) for this contract at its meeting on March 19, 2020.
> request for qualifications
> supplemental information 1
> supplemental information 2
> letter template

September 7, 2019
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects to provide professional design services for the Global Campus first floor renovation. The deadline for responses is 1:00 PM local time on Monday, September 23, 2019.
Update: The Board of Trustees selected Polk Stanley Wilcox (Fayetteville and Little Rock, AR) for this contract at its meeting on November 22, 2019.
> request for qualifications

May 24, 2019
NOTICE TO ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide professional design services for the Epley Center for Health Professions Mechanical System Replacement. The deadline for responses is 1:00 PM local time on Monday, June 10, 2019.
Update: The Board of Trustees selected Henderson Engineers (Bentonville, AR) for this contract at its meeting on September 13, 2019.
> request for qualifications

March 29, 2019
NOTICE TO PROFESSIONAL CONSULTANTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified consultants to provide professional services for the Arkansas Research and Technology Park Advancement Plan. The deadline for responses is 1:00 PM local time on Wednesday, April 17, 2019.
Update: The University of Arkansas Technology Development Foundation Board met on May 7, 2019 and approved HR&A Advisors (Washingon, DC) and Perkins+Will (Washingon, DC) as the planning consultants for this project.
> request for qualifications

March 23, 2019
NOTICE TO AUTOMATIC TEMPERATURE CONTROL EQUIPMENT VENDORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified vendors to provide Automatic Temperature Control Equipment, Material and Services under an Indefinite Delivery Indefinite Quantity (IDIQ) contract for new construction and renovation projects. A voluntary pre-proposal meeting will be held at 10:30 AM on Thursday, April 11, 2019 at Facilities Management Main Conference Room, 521 S. Razorback Road, Fayetteville, AR. The Owner will receive sealed proposals until 2:00 PM on Tuesday, April 23, 2019.
Update: Harrison Energy Partners (Little Rock, AR) and Powers of Arkansas (Springdale and Little Rock, AR) have been selected for this contract.
> request for proposals
> addendum 1
> addendum 2
> addendum 3
> supporting information
> supporting information

March 16, 2019
NOTICE TO AUDIO VISUAL EQUIPMENT VENDORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified vendors to provide Audio Visual Design and Installation under an Indefinite Delivery Indefinite Quantity (IDIQ) contract for new construction and renovation projects. A voluntary pre-proposal meeting will be held at 11:00 AM on Thursday, March 28, 2019 at Facilities Management Main Conference Room, 521 S. Razorback Road, Fayetteville, AR. The Owner will receive sealed proposals until 3:00 PM on Tuesday, April 9, 2019.
Update: Keystone Digital (Ozark, MO) has been selected for this contract.
> request for proposals
> addendum 1
> addendum 2
> supporting information
> supporting information

March 8, 2019
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects to provide professional design services for the Arkansas Union tenant infill. The deadline for responses is 1:00 PM local time on Monday, March 25, 2019.
Update: The Board of Trustees selected Hufft (Bentonville, AR) for this contract at its meeting on May 23, 2019.
> request for qualifications
> supplemental information

February 2, 2019
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for the construction of the Leroy Pond Drive extension located in Fayetteville, Arkansas. The bids shall be on a lump sum basis. A pre-bid conference will be held at 2:00 PM local time on February 14, 2019 at Facilities Management, Main Conference Room, 521 S. Razorback Road, Fayetteville, Arkansas.The Owner will receive bids until 2:00 PM local time on February 26, 2019.
Update: Nabholz Construction Services (Rogers and Conway, AR) was the successful bidder.
> invitation to bid
> addendum 1
> addendum 2

January 4, 2019
NOTICE TO CIVIL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified civil engineers for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Tuesday, January 22, 2019.
Update: The Board of Trustees selected McClelland Engineers (Fayetteville and Little Rock, AR) and DCI Inc. (Fayetteville and Little Rock, AR) for this contract at its meeting on March 28, 2019.
> request for qualifications

October 6, 2018
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for the Arkansas Research and Technology Park pedestrian improvements project located in Fayetteville, Arkansas. The bids shall be on a lump sum basis. A pre-bid conference will be held at 2:00 PM local time on October 18, 2018 at Facilities Management, Main Conference Room, 521 S. Razorback Road, Fayetteville, Arkansas.The Owner will receive bids until 2:00 PM local time on October 30, 2018.
Update: Oelke Construction Company (Springdale, AR) was the successful bidder.
> invitation to bid
> addendum 1
> addendum 2
 September 1, 2018
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Track Operations Center. The deadline for responses is 1:00 PM local time on Tuesday, September 18, 2018.
Update: The Board of Trustees selected Hufft (Bentonville, AR) with AECOM (Kansas City, MO) for this contract at its meeting on November 15, 2018.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for the Track Operations Center. The deadline for responses is 1:00 PM local time on Tuesday, September 18, 2018.
Update: The Board of Trustees selected Flintco (Tulsa, OK and Springdale, AR) for this contract at its meeting on November 15, 2018.
> request for qualifications
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Randal Tyson Track Center interior renovation and addition. The deadline for responses is 1:00 PM local time on Tuesday, September 18, 2018.
Update: The Board of Trustees selected Polk Stanley Wilcox (Fayetteville and Little Rock, AR) with Populous (Kansas City, MO) for this contract at its meeting on November 15, 2018.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for the Randal Tyson Track Center interior renovation and addition. The deadline for responses is 1:00 PM local time on Tuesday, September 18, 2018.
Update: The Board of Trustees selected CDI Contractors, LLC ( Fayetteville and Little Rock, AR) for this contract at its meeting on November 15, 2018.
> request for qualifications
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Baseball Clubhouse. The deadline for responses is 1:00 PM local time on Tuesday, September 18, 2018.
Update: The Board of Trustees selected WER (Fayetteville and Little Rock, AR) with HKS (Dallas, TX) for this contract at its meeting on November 15, 2018.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for the Baseball Clubhouse. The deadline for responses is 1:00 PM local time on Tuesday, September 18, 2018.
Update: The Board of Trustees selected Kinco Constructors (Springdale and Little Rock, AR) for this contract at its meeting on November 15, 2018.
> request for qualifications

August 24, 2018
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for the Graduate Education Building Mechanical and
Electrical Systems Renewal project located in Fayetteville, Arkansas. The bids shall be on a lump sum basis. A pre-bid conference will be held at 10:00am local time on September 5, 2018 at Facilities Management, Main Conference Room, 521 S. Razorback Road, Fayetteville, Arkansas.The Owner will receive bids until 2:00pm local time on September 18, 2018.
Update: Kinco Constructors (Springdale and Little Rock, AR) was the successful bidder.
> invitation to bid

August 3, 2018
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for the Central Utility Plant Shop and Power Center. The deadline for responses is 1:00 PM local time on Friday, August 17, 2018.
Update: The Board of Trustees selected DEMX Architecture (Fayetteville, AR) with Affiliated Engineers (Chapel Hill, NC) for this contract at its meeting on November 15, 2018.
> request for qualifications

July 6, 2018
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for the Alpha Delta Pi renovation. The deadline for responses is 1:00 PM local time on Friday, July 20, 2018.
Update: The Board of Trustees selected WER (Fayetteville and Little Rock, AR) for this contract at its meeting on September 14, 2018.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for the Alpha Delta Pi renovation. The deadline for responses is 1:00 PM local time on Friday, July 20, 2018.
Update: The Board of Trustees selected Kinco Constructors (Springdale and Little Rock, AR) for this contract at its meeting on September 14, 2018.
> request for qualifications

March 10, 2018
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for all labor, material, and equipment necessary for the construction of Beechwood Remote Parking located west of Beechwood Ave., between Martin Luther King Blvd. and West 15th Street. The bids shall be on a lump sum basis. A pre-bid conference will be held at 10:00am local time on March 20, 2018 at Facilities Management, main conference room A103, 521 S. Razorback Road, Fayetteville, Arkansas.The Owner will receive bids until 2:00pm local time on March 27, 2018 at University of Arkansas Administration Building, ADMN 321, 1125 W. Maple St., Fayetteville, Arkansas 72701. Attn. James Ezell.
Update: APAC –Central Inc (Fayetteville, AR) was the successful bidder.
> invitation to bid

February 24, 2018
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for all labor, material, and equipment necessary for the construction of parking lot 54A located north of Martin Luther King Blvd., between Eastern Avenue and Razorback Road. The bids shall be on a lump sum basis. A pre-bid conference will be held at 10:00am local time on March 6, 2018 at Facilities Management, main conference room A103, 521 S. Razorback Road, Fayetteville, Arkansas.The Owner will receive bids until 2:00pm local time on March 13, 2018 at University of Arkansas Administration Building, ADMN 321, 1125 W. Maple St., Fayetteville, Arkansas 72701. Attn. James Ezell.
Update: Tri Star Contractors LLC (Siloam Springs, AR) was the successful bidder.
> invitation to bid

February 3, 2018
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested General Contractors to provide Job Order Contracting (JOC) services. There will be a voluntary pre-proposal meeting at 2:00 pm local time on Tuesday, February 13, 2018 at Facilities Management, main conference room A103, 521 S. Razorback Road, Fayetteville, Arkansas. The deadline for competitive, sealed proposal submittals is 2:00 pm local time, on Tuesday, February 27, 2018 at University of Arkansas Administration Building, ADMN 321, 1125 W. Maple St. Fayetteville, AR 72701. Attn. James Ezell.
Update: Contracts have been awarded to CDI Contractors (Fayetteville and Little Rock, AR), Flintco Constructive Solutions (Springdale, AR), Kinco Constructors (Springdale and Little Rock, AR), KBH2 dba Elite Inc. (Springdale, AR), and Nabholz Construction Services (Rogers, AR) on July 1, 2018.
> request for proposal
> addendum 1

January 27, 2018
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a General Contract for all labor, material, and equipment necessary for the construction of the University of Arkansas Campus Steam Improvements Project on the University of Arkansas campus in Fayetteville. The bids shall be on a lump sum basis. A pre-bid conference will be held at 10:00am, on Thursday February 8, 2018 at the Facilities Management Main Conference Room, A-103, 521 S. Razorback Road, Fayetteville, AR 72701.The Owner will receive bids until 2:00pm CST on Thursday, February 22, 2018 at the University of Arkansas Procurement Department, 321 Administration Building, University of Arkansas, Fayetteville, AR 72701. Attn: James Ezell. Bids received after this time will not be accepted.
Update: All bids rejected.
> invitation to bid

December 21, 2017
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for the Student Success Center. The deadline for responses is 1:00 PM local time on Tuesday, January 16, 2018.
Update: The Board of Trustees selected Core Architects (Rogers, AR) with HBRA Architects (Chicago, IL) for this contract at its meeting on March 29, 2018.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for the Student Success Center. The deadline for responses is 1:00 PM local time on Tuesday, January 16, 2018.
Update: The Board of Trustees selected VCC (Little Rock, AR and Fayetteville, AR) for this contract at its meeting on March 29, 2018.
> request for qualifications
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for the Windgate Art and Design District buildings. The deadline for responses is 1:00 PM local time on Tuesday, January 16, 2018.
Update: The Board of Trustees selected MAHG Architecture (Fort Smith, AR) with HGA (Minneapolis, MN) for this contract at its meeting on March 29, 2018.
> request for qualification
> supplemental information
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for the Windgate Art and Design District buildings. The deadline for responses is 1:00 PM local time on Tuesday, January 16, 2018.
Update: The Board of Trustees selected Clark Contractors (Little Rock, AR and Bentonville, AR) for this contract at its meeting on March 29, 2018.
> request for qualifications
> supplemental information

November 10, 2017
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects to provide professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Wednesday, November 29, 2017.
Update: The Board of Trustees selected Core Architects (Rogers, AR), Hufft Projects (Bentonville, AR and Kansas City, MO) and WER Architects (Fayetteville, AR and Little Rock, AR) for this contract at its meeting on March 29, 2018.
> request for qualifications
NOTICE TO CIVIL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified civil engineers for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Wednesday, November 29, 2017.
Update: The Board of Trustees selected McGoodwin Williams & Yates (Fayetteville, AR) and HFA (Bentonville, AR) for this contract at its meeting on March 29, 2018.
> request for qualifications
NOTICE TO GEOTECHNICAL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified geotechnical engineers for professional services contracts (“on-call”). The deadline for responses in 1:00pm local time on Wednesday, November 29, 2017.
Update: The Board of Trustees selected Grubbs, Hoskyn, Barton & Wyatt, Inc. (Little Rock, AR and Springdale, AR) and McClelland Consulting Engineers, Inc. (Little Rock, AR and Fayetteville, AR) for this contract at its meeting on March 29, 2018.
> request for qualifications

August 18, 2017
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for the Mullins Library renovation. The deadline for responses is 1:00 PM local time on Wednesday, September 6, 2017.
Update: The Board of Trustees selected Miller Boskus Lack (Fayetteville, AR) with Perry Dean Rogers | Partners (Boston, MA) for this contract at its meeting on November 9, 2017.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for the Mullins Library renovation. The deadline for responses is 1:00 PM local time on Wednesday, September 6, 2017.
Update: The Board of Trustees selected Con-Real (Little Rock, AR and Arlington, TX) for this contract at its meeting on November 9, 2017.
> request for qualifications

July 29, 2017
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for the Arkansas Union Food Court renovation. The deadline for responses is 1:00pm local time on Monday, August 14, 2017.
Update: The Board of Trustees selected Hufft Projects (Bentonville, AR and Kansas City, MO) for this contract at its meeting on November 9, 2017.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for the Arkansas Union Food Court renovation. The deadline for responses is 1:00pm local time on Monday, August 14, 2017.
Update: The Board of Trustees selected CDI Contractors (Little Rock and Fayetteville, AR) for this contract at its meeting on November 9, 2017.
> request for qualifications
NOTICE TO CIVIL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for Beechwood Remote Parking. The deadline for responses is 1:00pm local time on Monday, August 14, 2017.
Update: The Board of Trustees selected McGoodwin Williams & Yates (Fayetteville, AR) with E.B. Landworks (Fayetteville, AR) for this contract at its meeting on November 9, 2017.
> request for qualifications

June 3, 2017
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for all labor, material, and equipment necessary for the Global Campus Interior Renovation, in a University of Arkansas building located at the northeast corner of the Fayetteville town square, for the Board of Trustees of the University of Arkansas acting on behalf of the University of Arkansas. The bids shall be on a lump sum basis. A pre-bid conference will be held at 2:00pm local time on Friday, June 16, 2017, at the Facilities Management Main Conference Room. The Owner will receive bids until 2:00pm local time on Friday, June 30, 2017.
Update: Oelke Construction Company (Springdale, AR) was the successful bidder.
> invitation to bid
> addendum 1
> addendum 2
> addendum 3

April 8, 2017
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for all labor, material, and equipment necessary for the construction of the Garvan Woodland Gardens tree house, located at Hot Springs National Park, for the Board of Trustees of the University of Arkansas acting on behalf of the University of Arkansas. The bids shall be on a lump sum basis. A pre-bid conference will be held at 2:00pm local time on Thursday, April 13, 2017, at the Facilities Management Main Conference Room. The Owner will receive bids until 2:00pm local time on Tuesday, April 25, 2017.
Update: CDI Contractors (Little Rock, AR) was the successful bidder.
> invitation to bid

March 24, 2017
NOTICE TO ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for Graduate Education Building Mechanical and Electrical Systems Renewal. The deadline for responses is 1:00pm local time on Monday, April 10, 2017.
Update: The Board of Trustees selected Bernhard TME (Fayetteville, AR) for this contract at its meeting on May 25, 2017.
> request for qualifications

March 17, 2017
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for all labor, material, and equipment necessary for the construction of the University of Arkansas National Center for Reliable Electric Power Transmission (NCREPT) addition, located at 2055 S. Innovation Way, Fayetteville, AR, for the Board of Trustees of the University of Arkansas acting on behalf of the University of Arkansas. The bids shall be on a lump sum basis. A pre-bid conference will be held at 9:00am local time on Wednesday, April 05, 2017, at the Facilities Management Main Conference Room. The Owner will receive bids until 2:00pm local time on Tuesday, April 11, 2017.
Update: Benchmark Construction of NWA (Fayetteville, AR) was the successful bidder.
invitation to bid

January 13, 2017
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for the Pomfret Dining Hall renovation and expansion. The deadline for responses is 1:00pm local time on Monday, January 30, 2017.
Update: The Board of Trustees selected Miller Boskus Lack (Fayetteville, AR) for this contract at its meeting on March 30, 2017.
request for qualifications
supplemental information - feasibility study
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for the Pomfret Dining Hall renovation and expansion. The deadline for responses is 1:00pm local time on Monday, January 30, 2017.
Update: The Board of Trustees selected Nabholz Construction Services (Rogers and Conway, AR) for this contract at its meeting on March 30, 2017.
request for qualifications
supplemental information - feasibility study
December 9, 2016
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects for professional services contracts (aka “on-call”). The deadline for responses is 1:00pm local time on Tuesday, January 10, 2017.
Update: The Board of Trustees selected Polk Stanley Wilcox (Fayetteville and Little Rock, AR) and SCM Architects (Fayetteville and Little Rock, AR) for this contract at its meeting on March 30, 2017.
> request for qualifications
NOTICE TO COMMISSIONING AGENTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified engineers to provide building commissioning services. The deadline for responses is 1:00pm local time on Tuesday, January 10, 2017.
Update: The Board of Trustees selected Viridian (Fayetteville and Little Rock, AR) for this contract at its meeting on March 30, 2017.
> request for qualifications
NOTICE TO ENVIRONMENTAL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified environmental engineers for professional services contracts (aka “on-call”). The deadline for responses is 1:00pm local time on Tuesday, January 10, 2017.
Update: The Board of Trustees selected Environmental Enterprise Group (Russellville, AR) and Geotechnical & Testing Services (Fayetteville, AR) for this contract at its meeting on March 30, 2017.
> request for qualifications
NOTICE TO GEOTECHNICAL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified geotechnical engineers for professional services contracts (aka “on-call”). The deadline for responses is 1:00pm local time on Tuesday, January 10, 2017.
Update: The Board of Trustees selected Geotechnical & Testing Services (Fayetteville, AR) for this contract at its meeting on March 30, 2017.
> request for qualifications
NOTICE TO MEP ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified mechanical - electrical - plumbing engineers for professional services contracts (aka “on-call”). The deadline for responses is 1:00pm local time on Tuesday, January 10, 2017.
Update: The Board of Trustees selected HSA Engineers (Fort Smith and Conway, AR) and Garver (Fayetteville and North Little Rock, AR) for this contract at its meeting on March 30, 2017.
> request for qualifications
August 19, 2016
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for the Stadium Drive Residence Halls. The deadline for responses is 1:00pm local time on Thursday, September 8, 2016.
Update: The Board of Trustees selected the team modus studio (Fayetteville, AR) with Leers Weinzapfel Associates (Boston, MA) and Mackey Mitchell Architects (Saint Louis, MO) for this contract at their November 11, 2016 meeting.
> request for qualifications
> supplemental information - conceptual plan
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to to provide general contractor construction management services for the Stadium Drive Residence Halls. The deadline for responses is 1:00pm local time on Thursday, September 8, 2016.
Update: The Board of Trustees selected Nabholz Construction Services (Rogers, AR) for this contract at their November 11, 2016 meeting.
> request for qualifications
> supplemental information - conceptual plan
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for the Delta Delta Delta Renovation and Expansion. The deadline for responses is 1:00pm local time on Thursday, September 8, 2016.
Update: The Board of Trustees selected the team of Yeary Lindsey Architects (Little Rock, AR) with MH Design (Springdale, AR) for this contract at their November 11, 2016 meeting.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to to provide general contractor construction management services for the Delta Delta Delta Renovation and Expansion. The deadline for responses is 1:00pm local time on Thursday, September 8, 2016.
Update: The Board of Trustees selected Baldwin & Shell Construction Company (Rogers, AR) for this contract at their November 11, 2016 meeting.
> request for qualifications
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for a new house for Delta Gamma. The deadline for responses is 1:00pm local time on Thursday, September 8, 2016.
Update: The Board of Trustees selected Core Architects (Rogers, AR) with Michael G. Imber (San Antonio, TX) and Cunningham + Associates (Columbia, MO) for this contract at their November 11, 2016 meeting.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to to provide general contractor construction management services for a new house for Delta Gamma. The deadline for responses is 1:00pm local time on Thursday, September 8, 2016.
Update: The Board of Trustees selected Kinco Constructors (Little Rock and Springdale, AR) for this contract at their November 11, 2016 meeting.
> request for qualifications
NOTICE TO ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for South Campus Steam System Improvements. The deadline for responses is 1:00pm local time on Thursday, September 8, 2016.
Update: The Board of Trustees selected Affiliated Engineers (Chapel Hill, NC) for this contract at their November 11, 2016 meeting.
> request for qualifications
February 5, 2016
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to to provide general contractor construction management services for the Donald W. Reynolds Razorback Stadium - North End Zone Addition and Stadium Updates. The deadline for responses is 1:00pm local time on Friday, February 19, 2016.
Update: The Board of Trustees selected CDI/Hunt Joint Venture (Fayetteville and Little Rock, AR/Scottsdale, AZ) for this contract at its meeting March 30, 2016.
> request for qualifications
January 15, 2016
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to to provide general contractor construction management services for the Sigma Alpha Epsilon renovation and addition. The deadline for responses is 1:00pm local time on Monday, February 1, 2016.
Update: The Board of Trustees selected East Harding Construction (Springdale and Little Rock, AR) for this contract at its meeting March 30, 2016.
> request for qualifications
January 8, 2016
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for the National Center for Reliable Electric Power Transmission (NCREPT) addition. The deadline for responses is 1:00pm local time on Monday, January 25, 2016.
Update: The Board of Trustees selected modus studio (Fayetteville, AR) for this contract at its meeting March 30, 2016.
> request for qualifications
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects to provide professional services contracts (aka "on-call"). The deadline for responses is 1:00pm on Monday, January 25, 2016.
Update: The Board of Trustees selected modus studio (Fayetteville, AR) and Morrison Architects (Holiday Island, AR) for this contract at its meeting March 30, 2016.
> request for qualifications
NOTICE TO MEP ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified MEP engineers to provide professional services contracts (aka "on-call"). The deadline for responses is 1:00pm on Monday, January 25, 2016.
Update: The Board of Trustees selected TME, Inc. (Fayetteville, AR) and Henderson Engineers, Inc. (Bentonville, AR) for this contract at its meeting March 30,2016.
> request for qualifications
NOTICE TO COMMISSIONING ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified engineers to provide building commissioning services. The deadline for responses is 1:00pm on Monday, January 25, 2016.
Update: The Board of Trustees selected Cromwell Energy Services (Little Rock, AR), Pinnacle Energy Services (Fayetteville, AR) , and Empirical Energy Solutions (Hensley, AR) for this contract at its meeting March 30, 2016.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for all labor, material, and equipment necessary for the construction of the Razorback Road Parking, located on the University of Arkansas campus in Fayetteville. The bids shall be on a lump sum basis. A pre-bid conference will be held at 2:00pm local time on Thursday, January 21, 2016, at the Facilities Management Main Conference Room. The Owner will receive bids until 2:00pm local time on Thursday, January 28, 2016.
Update: Nabholz Construction Services (Rogers and Conway, AR) was the successful bidder.
> invitation to bid
November 27, 2015
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for the Global Campus interior renovation. The deadline for responses is 1:00pm local time on Monday, December 14, 2016.
Update: The Board of Trustees selected HFA (Bentonville, AR) for this contract at its meeting on January 28, 2016.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to to provide general contractor construction management services for the Civil Engineering Research and Education Center . The deadline for responses is 1:00pm local time on Monday, December 14, 2015.
Update: The Board of Trustees selected CDI Contractors (Little Rock and Fayetteville, AR) for this contract at its meeting on January 28, 2016.
> request for qualifications
> supplemental information - program excerpt
September 3, 2015
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects to provide professional design services for a library storage building. The deadline for responses is 1:00pm local time on Monday, September 21, 2015.
Update: The Board of Trustees selected Miller Boskus Lack (Fayetteville, AR) with Perry Dean Rogers | Partners (Boston, MA) for this contract at its meeting on November 20, 2015.
> request for qualifications
> supplemental information - library storage study
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to to provide general contractor construction management services for a library storage building. The deadline for responses is 1:00pm local time on Monday, September 21, 2015.
Update: The Board of Trustees selected Con-Real (Little Rock, AR and Arlington, TX) for this contract at its meeting on November 20, 2015.
> request for qualifications
> supplemental information - library storage study
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects to provide professional design services for the Kimpel Hall classroom block renovation and student media addition. The deadline for responses is 1:00pm local time on Monday, September 21, 2015.
Update: The Board of Trustees selected mahg architecture (Fort Smith, AR) with Dake|Wells architecture (Springfield, MO) for this contract at its meeting on November 20, 2015.
> request for qualifications
> supplemental information - site fit test
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for the Kimpel Hall classroom block renovation and student media addition. The deadline for responses is 1:00pm local time on Monday, September 21, 2015.
Update: The Board of Trustees selected CDI Contractors (Little Rock and Fayetteville, AR) for this contract at its meeting on November 20, 2015.
> request for qualifications
> supplemental information - site fit test
August 21, 2015
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified architects to provide professional design services for an addition to Pat Walker Health Center. The deadline for responses is 1:00pm local time on Wednesday, September 9, 2015.
Update: The Board of Trustees selected Taggart Architects (Little Rock and Fayetteville, AR) for this contract at its meeting on November 20, 2015.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to to provide general contractor construction management services for an addition to Pat Walker Health Center. The deadline for responses is 1:00pm local time on Wednesday, September 9, 2015.
Update: The Board of Trustees selected Nabholz Construction Services (Conway and Rogers, AR) for this contract at its meeting on November 20, 2015.
> request for qualifications
NOTICE TO LANDSCAPE ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified landscape architects to provide professional design services for playing fields for University Recreation. The deadline for responses is 1:00pm local time on Wednesday, September 9, 2015.
Update: The Board of Trustees selected SmithGroupJJR (Dallas, TX) for this contract at its meeting on November 20, 2015.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for playing fields for University Recreation. The deadline for responses is 1:00pm local time on Wednesday, September 9, 2015.
Update: The Board of Trustees selected Nabholz Construction Services (Conway and Rogers, AR) for this contract at its meeting on November 20, 2015.
> request for qualifications
June 7, 2015
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for all labor, material, and equipment necessary for the construction of the Fowler House Garden and Conservatory, located on the University of Arkansas campus in Fayetteville. The bids shall be on a lump sum basis. A pre-bid conference will be held at 9:00 AM on Thursday, June 11, 2015, at the Facilities Management Main Conference Room. The Owner will receive bids until 2:00 PM on Tuesday, June 30, 2015.
Update: Pick-it Construction (Fayetteville, AR) was the successful bidder.
> invitation to bid
March 20, 2015
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for all labor, material, and equipment necessary for the construction of a high pressure natural gas service line, located on the University of Arkansas campus in Fayetteville. The bids shall be on a lump sum basis. A mandatory pre-bid conference and site visit will be held at 10:00 AM on Thursday, April 2, 2015, at the Facilities Management Main Conference Room. The Owner will receive bids until 2:00 PM on Thursday, April 9, 2015.
Update: Energy Services South (Livingston, AL) was the successful bidder.
> invitation to bid
January 25, 2015
NOTICE TO GENERAL CONTRACTORS / INVITATION TO BID
You are invited to bid on a general contract for all labor, material, and equipment necessary for the construction of the Art and Design District. The district is located on University of Arkansas property on S Hill Avenue in Fayetteville. The bids shall be on a lump sum basis. A pre-bid conference will be held at 9:30 AM on February 5, 2015, at the Facilities Management Main Conference Room. The Owner will receive bids until 2:00 PM on February 17, 2015 Tuesday, February 24, 2015.
Update: Due to inclement weather and the hardships imposed by the weather on the contracting community, the bid date for the University of Arkansas Art and Design District is being postponed to Tuesday, February 24, 2015 at 2:00pm. Questions and RFIs will be taken until the end of business Tuesday, February 17, 2015.
Update: Nabholz Construction Services (Rogers and Conway, AR) was the successful bidder.
> invitation to bid
December 5, 2014
NOTICE TO CIVIL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified civil engineers for professional services contracts (aka "on-call"). The deadline for responses is 1:00 PM CST on Friday, December 19, 2014.
> request for qualifications
November 7, 2014
NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for a renovation and addition to the Sigma Alpha Epsilon house. The deadline for responses is 1:00 PM CST on Friday, November 21, 2014.
Update: The Board of Trustees selected Allison Architects (Fayetteville and Little Rock, AR) for this contract at its meeting January 21, 2015
> request for qualifications
NOTICE TO ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional design services for a university-owned Natural Gas Bypass Pipeline. The deadline for responses is 1:00 PM CST on Friday, November 21, 2014.
> request for qualifications
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide general contractor construction management services for a university-owned Natural Gas Bypass Pipeline. The deadline for responses is 1:00 PM CST on Friday, November 21, 2014.
> request for qualifications
September 5, 2014
INVITATION TO BID / AFLS BASEMENT RENOVATIONS
You are invited to bid on a general contract for all labor, material, and equipment necessary for the construction of AFLS Basement Renovations on the University of Arkansas campus in Fayetteville. The bids shall be on a lump sum basis. A pre-bid conference will be held at 1:00 PM on Wednesday, September 24, 2014, at the Facilities Management Main Conference Room. The Owner will receive bids until 2:00 PM on Tuesday, October 7, 2014.
> invitation to bid
June 13, 2014
REQUEST FOR PROPOSALS /
BUILDING SECURITY, FIRE ALARM, VIDEO SURVEILLANCE, AND ACCESS CONTROL SYSTEMS IDIQ
The University of Arkansas, in accordance with the policies of the Board of Trustees, is requesting proposals from qualified equipment vendors to furnish and deliver building security, fire alarm, video surveillance, and access controls systems for construction and renovation projects on the University of Arkansas campus in Fayetteville. The intent is to award at least one contract for Indefinite Delivery and Indefinite Quantity (IDIQ) of equipment specified in the Request for Proposals (RFP). A voluntary pre-proposal meeting will be held at 10:00 AM CDT, Tuesday, July 1, 2014, at the Facilities Management Main Conference Room 103A, 521 S. Razorback Road, Fayetteville, AR 72701. The Owner will receive sealed proposals until 2:00 PM CDT on Tuesday, July 8, 2014.
> addendum 1
> addendum 1 - cost worksheet
> cost worksheets
> request for proposals
January 31, 2014
NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested General Contractors to provide Job Order Contracting (JOC) services. There will be voluntary pre-proposal meeting at 10:00 am CST on Tuesday, February 11, 2014 at Facilities Management, 521 South Razorback Road, Fayetteville, Arkansas. The deadline for competitive, sealed proposals is 2:00 pm CST on Wednesday, February 26, 2014 at 321 Administration Building.
Update: Contracts have been awarded to CDI Contractors (Fayetteville and Little Rock, AR), Flintco Constructive Solutions (Springdale, AR), Kinco Constructors (Springdale and Little Rock, AR), and The Cone Group (Fayetteville and Little Rock AR).
> informational item 2
> informational item 1
> pre-proposal meeting attendance list
> addendum 1
> request for proposals
|