INVITATION TO BID
You are invited to bid on a General Contract for Davis Hall Addition and Renovations, located at 1030 West Maple Street. The bids shall be on a lump sum basis.The building will be LEED Certified at the Silver Level. There will be PRE-BID CONFERENCE on November 23, 2009 at 9:00AM at Facilities Management, 521 South Razorback Road, Fayetteville, Arkansas. The Owner will receive bids until 2:00PM CST on December 11, 2009.

> more

<empty>

October 30, 2009

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide architectural services for an Arkansas Athletics Facilities Master Plan and a Football Operations Center. The deadline for responses is Friday, November 13, 2009 @ 3:00pm CST.

> more

<empty>

October 16, 2009

REQUEST FOR PROFESSIONAL PLANNING SERVICES
You are invited to respond to a request for qualifications for an Interpretation Master Plan for Garvan Woodland Gardens. Garvan Woodland Gardens is the Botanical Garden of the University of Arkansas System and is administered by the University of Arkansas, Fayetteville. The deadline for responses is 4:30 PM on Friday, November 6, 2009.

> more
> Averill Master Plan 2008 (appendices not included)
> Maps and Illustrations
> Education Master Plan 2006


<empty>

September 24, 2009

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide architectural services for the renovation of Bud Walton Hall. The central, 2-story section of this building (currently vacant) is proposed as the future location of the David and Barbara Pryor Center for Arkansas Oral and Visual History. The southern, 3-story portion of this building is proposed as the future location of the Arkansas Center for Space and Planetary Sciences. The deadline for responses is 3:00 PM on Friday, October 9, 2009.

> more

<empty>

September 18, 2009

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide architectural services for a Nursing Building and Speech and Hearing Clinic. The deadline for responses is 3:00 PM on Friday, October 2, 2009.

> more

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide architectural services for Lambda Chi Alpha Fraternity. The deadline for responses is 3:00 PM on Friday, October 2, 2009.

> more

<empty>

August 28, 2009

INVITATION TO BID
You are invited to bid on a General Contract for Renovation to Chemistry Labs 316 and 317 in the Science Building (Science "D"). The bids shall be on a lump sum basis. There will be PRE-BID CONFERENCE at at 10:00 a.m. on September 10, 2009 at Facilities Management, 521 South Razorback Road, Fayetteville, Arkansas. The Owner will receive bids until 2:00PM CST on September 17, 2009.

Update: Southern Building Services (Fort Smith, AR) was the successful bidder.

> more

<empty>

July 20, 2008

NOTICE TO ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide engineering services for Campus District Energy Systems Efficiency and Capacity Improvements. Consultants will investigate a wide spectrum of potential major capital improvements to the campus’ district energy systems, with the objectives of improving system reliability, accommodating campus growth, and reducing campus utility costs and the associated carbon footprint through energy savings. Written responses will be considered if received by 3:00 PM on Tuesday, August 4, 2009.

> more

<empty>

May 8, 2009

NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested General Contractors to provide Job Order Contracting (JOC) services. The deadline for responses is 2:00 PM CST on May 27, 2009 Thursday, May 28, 2009.

Update: Alpha Building Corporation (San Antonio, TX), Milestone Construction (Springdale, AR), and Nabholz Client Services (Rogers, AR) were awarded these contracts.

> invitation to propose
> agreement form
> proposal form
> addendum 1
> addendum 2 - please note that bid date has changed.

<empty>

April 24, 2009

INVITATION TO BID
You are invited to bid on a General Contract for Brough Commons dining hall renovation. The bids shall be on a lump sum basis. The Owner will receive bids until 2:00PM CST April 30, 2009 May 7, 2009.

Please note that bid date has changed.

Update: Benchmark Construction of NWA, Inc. (Fayetteville, AR) was the successful bidder.

> more

<empty>

April 23, 2009

INVITATION TO BID
You are invited to bid on a General Contract for a greenhouse renovation. The bids shall be on a lump sum basis. The Owner will receive bids until 2:00PM CST May 19, 2009.

Update: Rough Brother, Inc. (Cincinnati, OH) was the successful bidder.

> more

<empty>

April 17, 2009

NOTICE TO COMMISSIONING ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested engineers to provide Building Commissioning Services. The selected consultant(s) will provide third party (contracted to the University) comprehensive commissioning for campus buildings. Written responses must be received by 3:00 PM on Friday, May 1, 2009.

Update: The Board of Trustees selected Viridian (Little Rock, AR) and Comfort Systems USA/Powers of Arkansas, Inc. (Little Rock, AR) for these contracts at its meeting on Friday, June 5, 2009.

> more

INVITATION TO BID
You are invited to bid on a General Contract for Kimpel Hall roof replacement. The bids shall be on a lump sum basis. There will be PRE-BID CONFERENCE at the University of Arkansas Facilities Management Building, 521 South Razorback Road, Fayetteville, Arkansas on Tuesday, April 28, 2009 at 10:30AM. The Owner will receive bids until 2:00PM CST May 5, 2009 May 6, 2009.

Note: The pre-bid meeting has been changed to Thursday, April 30, 2009 at 10:30AM.

Update: Industrial Roofing & Construction, LLC (Monroe, LA) was the successful bidder.

> more
> download addendum 1 - please note that bid date has changed.

<empty>

March 27, 2009

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested architects to provide Design Professional Services. The purpose of this contract is to provide on call architectural services for various renovation and construction projects on campus. Written responses must be received by 3:00 PM on Friday, April 10, 2009.

Update: The Board of Trustees selected SCM Architects (Little Rock, AR) and Polk Stanley | Rowland Curzon Porter Architects, LTD (Fayetteville and Little Rock, AR) for these contracts at its meeting on Friday, June 5, 2009.

> more

NOTICE TO MEP ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested Mechanical-Electrical-Plumbing Engineers to provide Design Professional Services. The purpose of this contract is to provide on call MEP engineering services for various renovation and construction projects on campus. Written responses must be received by 3:00 PM on Friday, April 10, 2009.

Update: The Board of Trustees selected Pettit & Pettit Engineers (Little Rock, AR) and Crafton Tull Sparks (Rogers and Little Rock, AR) for these contracts at its meeting on Friday, June 5, 2009.

> more

NOTICE TO CIVIL ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested Civil Engineers to provide Design Professional Services. The purpose of this contract is to provide on call civil engineering services for various renovation and construction projects on campus. Written responses must be received by 3:00 PM on Friday, April 10, 2009.

Update: The Board of Trustees selected McGoodwin Williams and Yates, Inc. (Fayetteville, AR) for this contract at its meeting on Friday, June 5, 2009.

> more

<empty>

March 19, 2009

INVITATION TO BID
You are invited to bid on a General Contract for the installation of approximately 1,400 linear feet of 12” waterline, 750 linear feet of 8” waterline, and associated fittings. The bids shall be on a lump sum basis. There will be PRE-BID CONFERENCE at the main conference room at the University of Arkansas Facilities Management Building, 521 South Razorback Road, Fayetteville, Arkansas on Friday, April 3, 2009 at 8:00AM. The Owner will receive bids until 2:00PM CST April 14, 2009.

Update: Dean Crowder Construction (Bentonville, AR) was the successful bidder.

> more

<empty>

March 12, 2009

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide architectural services for the renovation and expansion of the existing Phi Gamma Delta (FIJI) house. Written responses must be received by 3:00PM on Monday, March 30, 2009.

Update: The Board of Trustees selected Yeary Lindsey Architects (Little Rock, AR), in association with Hurd Long (Conway, AR), for this contract at its meeting on Friday, April 17, 2009.

> more

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide architectural services for the restoration and renovation of Peabody Hall. Written responses must be received by 3:00PM on Monday, March 30, 2009.

Update: The Board of Trustees selected Allison Architects (Fayetteville and Little Rock, AR), in association with Schwartz/Silver Architects (Boston, MA), for this contract at its meeting on Friday, April 17, 2009.

> more

NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional construction management services for the restoration and renovation of Peabody Hall. Written responses must be received by 3:00PM on Monday, March 30, 2009.

Update: The Board of Trustees selected East Harding, Inc. (Little Rock, AR) for this contract at its meeting on Friday, April 17, 2009.

> more

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide architectural services for a comprehensive renovation of Pomfret Honors Quarters. Written responses must be received by 3:00PM on Monday, March 30, 2009.

Update: The Board of Trustees selected Wittenberg, Delony & Davidson Architects, Inc. (Fayetteville and Little Rock, AR), in association with Treanor Architects (Lenexa, KS), for this contract at its meeting on Friday, April 17, 2009.

> more

NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional construction management services for a comprehensive renovation of Pomfret Honors Quarters. Written responses must be received by 3:00PM on Monday, March 30, 2009.

Update: The Board of Trustees selected Nabholz Construction, LLC (Rogers and Little Rock, AR) for this contract at its meeting on Friday, April 17, 2009.

> more



<empty>

March 9, 2009

INVITATION TO BID
You are invited to bid on a General Contract for all labor, material, and equipment necessary remove existing trees damaged by ice including the stumps, planting replacement trees, and installing sod on the University of Arkansas campus located in the City of Fayetteville. The bids shall be on a lump sum basis. There will be PRE-BID CONFERENCE at the main conference room at the University of Arkansas Facilities Management Building, 521 South Razorback Road, Fayetteville, Arkansas on March 17, 2009 at 10:00AM. The Owner will receive sealed bids until 2:00PM CST March 24, 2009.

Update: Frank Sharum Landscape Design, Inc. (Fort Smith, AR) was the successful bidder.

> more

<empty>

February 13, 2009

INVITATION TO BID
You are invited to bid on a General Contract for Futrall Hall Improvements. The bids shall be on a lump sum basis. There will be PRE-BID CONFERENCE at the main conference room at the University of Arkansas Facilities Management Building, 521 South Razorback Road, Fayetteville, Arkansas on February 24, 2009 at 1:30PM. The Owner will receive bids until 2:00PM CST March 5, 2009.

Update: Kim Hoadley Construction Co., Inc. (Fayetteville, AR) was the successful bidder.

> more

INVITATION TO BID
You are invited to bid on a General Contract for Humpreys Hall Carpet Replacement. The bids shall be on a lump sum basis. There will be PRE-BID CONFERENCE at the main conference room at the University of Arkansas Facilities Management Building, 521 South Razorback Road, Fayetteville, Arkansas on February 23, 2009 at 2:30PM. The Owner will receive bids until 3:00PM CST March 5, 2009.

Update: Miller Commercial Flooring Inc. (Springdale, AR) was the successful bidder.

> more

INVITATION TO BID
You are invited to bid on a General Contract for NWQuad Hall Painting. The bids shall be on a lump sum basis. There will be PRE-BID CONFERENCE at the main conference room at the University of Arkansas Facilities Management Building, 521 South Razorback Road, Fayetteville, Arkansas on February 23, 2009 at 1:00PM. The Owner will receive bids until 2:30PM CST March 5, 2009.

Update: Laxen Painting (Rogers, AR) was the successful bidder.

> more

<empty>

February 9, 2009

INVITATION TO BID
You are invited to bid on a General Contract for Futrall Hall Ventilation Air System Renovations. The bids shall be on a lump sum basis. There will be PRE-BID CONFERENCE at the main conference room at the University of Arkansas Facilities Management Building, 521 South Razorback Road, Fayetteville, Arkansas on February 19, 2009 at 10:00AM. The Owner will receive bids until 2:00PM CST March 3, 2009.

Update: Action Inc. (Barling, AR) was the successful bidder.

> more

<empty>

December 5, 2008

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide Architectural Services for the restoration and renovation of Davis Hall. Written responses must be received by 3:00PM on Friday, December 19, 2008.

Update: The Board of Trustees selected Robert Sharp Architect (Fayetteville, AR), in association with Frank & Lohsen Architects Inc. (Washington, DC), for this contract at its meeting on Friday, January 16, 2009.

> more

<empty>

November 21, 2008

INVITATION TO BID
You are invited to bid on a General Contract for KUAF 91.3 National Public Radio. The bids shall be on a lump sum basis. The Owner will receive bids until 2:00PM CST December 18, 2008.

Update: SSI, Inc. (Tontitown, AR) was the successful bidder.

> more

NOTICE TO LIGHTING ENGINEERS / DESIGNERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide on-call services for campus lighting projects. Written responses must be received by 3:00 PM on Monday, December 8, 2008.

Update: The Board of Trustees selected Clear Energy Services, LLC (Fayetteville AR) with HP Engineering Inc. (Rogers AR) for this contract at its meeting on Friday, January 16, 2009.

> more

<empty>

October 22, 2008

NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide professional construction management services for fiber optic cable installations for the Arkansas Research and Education Optical Network (ARE-ON). Written responses will be considered if received by 3:00 PM on Friday, October 31, 2008.

Update: The Board of Trustees selected CDI Contractors, LLC (Little Rock and Johnson, AR) as the general contractor and McClelland Consulting Engineers / CT&T (Fayetteville, AR) as the engineer for this contract at its meeting on Friday, January 16, 2009.

> more

<empty>

October 10, 2008

NOTICE TO GENERAL CONTRACTORS
You are invited to bid on a General Contract for new and renovation construction activities associated with elevator code compliance upgrades. The bids shall be on a lump sum basis. There will be a NON-MANDATORY PRE-BID MEETING on Tuesday, October 21, 2008 at 1:30 pm. Bids must be received by 2:00 PM CST, Thursday, October 30, 2008.

Update: CDI Contractors, LLC (Little Rock and Johnson, AR) was the successful bidder.

> more

<empty>

August 22, 2008

INVITATION TO BID
You are invited to bid on a General Contract for renovation to the Phi Delta Theta Fraternity House. The bids shall be on a lump sum basis. There will be a PRE-BID CONFERENCE on September 9, 2008 at 1:00 PM. Bids must be received by 2:00 PM CST on September 18, 2008.

Update: Kinco Constructors (Little Rock and Springdale, AR) was the successful bidder.

> more

<empty>

July 11, 2008

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide planning services for Arkansas Union. Written responses must be received by 3:00PM on Friday, July 25, 2008.

Update: The selection committee met on August 20, 2008 and selected the team of Perry Dean Rogers | Partners Architects (Boston, MA) with Amirmoez Foster Hailey Johnson (Fayetteville, AR) to provide planning and programming services for this project.

> more

<empty>


May 30, 2008

NOTICE TO ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide engineering services for the Arkansas Research and Education Optical Network (ARE-ON). ARE-ON is building a high-speed fiber optic network throughout the state of Arkansas to connect the eleven four-year public universities to national research and education networks. Written responses will be considered if received by 3:00 PM on Monday, June 16, 2008.

Update: McClelland Consulting Engineers, Inc. (Fayetteville and Little Rock, AR) was selected by the ARE-ON Board of Directors for this contract.

> more

<empty>

April 18, 2008

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide Architectural Services for KUAF National Public Radio 91.3. Written responses must be received by 3:00 PM on Monday, May 5, 2008.

Update: The Board of Trustees selected Polk Stanley Rowland Curzon Porter Architects (Fayetteville and Little Rock, AR) for this contract at its meeting on Friday, June 6, 2008.

> more

<empty>


April 15, 2008

INVITATION TO BID
You are invited to bid on a General Contract for Holcombe Hall HVAC Renovations. The bids shall be on a lump sum basis. There will be MANDATORY PRE-BID CONFERENCE held at the main conference room at the University of Arkansas Facilities Management Building, 521 South Razorback Road, Fayetteville, Arkansas on April 24, 2008 at 2:00 PM. Bids must be received by 2:00 PM CST on May 1, 2008.

Update: Alpha Building Corporation (San Antonio, TX and Fayetteville, AR) was the successful bidder.

> more

<empty>

February 8, 2008

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide planning services for David W. Mullins Library. Written responses must be received by 3:00PM on Friday, February 22, 2008.

Update: The selection committee met on April 22, 2008 and selected the team of Perry Dean Rogers | Partners Architects (Boston, MA) to provide planning and programming services for this project.

Update: The selection committee met on Monday, March 17, 2008 and selected the teams of 1) Perry Dean Rogers | Partners Architects (Boston, MA) and 2) Meyer Scherer & Rockcastle (Minneapolis, MN) with Amirmoez Foster Hailey Johnson (Fayetteville, AR) to provide full proposals. The final selection will be made on the basis of these written proposals.

> more

<empty>

February 1, 2008

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide Architectural Services for a new Laboratory for Nanoscience and Technology. Written responses must be received by 3:00PM on Friday, February 15, 2008.

Update: The Board of Trustees selected HDR Architecture, Inc. (Alexandria VA) for this contract at its meeting on March 28, 2008.

> more

NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide General Contractor construction management services for a new Laboratory for Nanoscience and Technology. Written responses will be considered if received by 3:00 PM on Friday, February 15, 2008.

Update: The Board of Trustees selected CDI Contractors, LLC (Little Rock and Johnson, AR) for this contract at its meeting on March 28, 2008.

> more

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, seeks qualified architects for Design Professional Contracts. Written responses must be received by 3:00PM on Friday, February 15, 2008. Two contracts will be awarded.

Update: The Board of Trustees selected Core Architects (Rogers, AR) and Harrison French & Associates, Ltd. (Bentonville, AR) for on call contracts at its regular meeting on March 28, 2008.

> more

NOTICE TO ENGINEERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, seeks qualified mechanical, electrical, and plumbing (MEP) engineers for Design Professional Contracts. Written responses must be received by 3:00PM on Friday, February 15, 2008. One contract will be awarded.

Update: The Board of Trustees selected TME, Inc. (Little Rock and Fayetteville, AR) and Henderson Engineers (Lenexa, KS and Bentonville, AR) for on call contracts at its regular meeting on March 28, 2008.

> more

<empty>

December 21, 2007

NOTICE TO BIDDERS
You are invited to bid on a General Contract for all labor, material, and equipment necessary to construct landscape and irrigation for Razorback Road from 6th Street to 15th Street in Fayetteville. A pre-bid conference will be held on January 8, 2008 at 2:00 PM at Facilities Management. Sealed bids must be received by 2:00 PM on January 23, 2008.

Update: Frank Sharum Landscape Design, Inc. (Fort Smith, AR) was the successful bidder.

> more

<empty>

October 19, 2007

INVITATION TO BID
You are invited to bid on a General Contract for the UAPD Communications System Upgrades for University of Arkansas Police Department. The bids shall be on a lump sum basis. There will be a MANDATORY PRE-BID MEETING on Friday, November 2, 2007 at 1:00 PM at the Facilities Management Main Conference Room. Bids must be received by 2:00 PM CST, Tuesday, November 13, 2007.

Update: Alpha Building Corp. (Fayetteville, AR) was the successful bidder.

Update: The owner will receive bids until 2:00pm local time, Tuesday, December 18, 2007. Please see Addendum 1 for more information.

> more
> addendum 1, posted 16 nov 07

<empty>

September 28, 2007

NOTICE TO REGISTERED INTERIOR DESIGNERS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, seeks qualified interior designers for Design Professional Contracts. Written responses must be received by 3:00 PM on Monday, October 15, 2007.

Update: The Board of Trustees selected Williams & Dean Interiors (Little Rock, AR) for this contract at its meeting on January 25, 2008.

> more

<empty>
September 21 , 2007

NOTICE TO CIVIL ENGINEERS AND LANDSCAPE ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide design services for campus Senior Walks. Written responses must be received by 3:00 PM on Friday, October 5, 2007.

Update: The Board of Trustees selected Development Consultants, Inc. (Little Rock and Fayetteville, AR) for this project at its meeting on November 16, 2007.

> more

<empty>
July 20, 2007

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide architectural services for a Child Development Research Center. Written responses will be considered if received by 3:00 PM on Friday, August 3, 2007.

Update: The Board of Trustees selected Miller Boskus Lack (Fayetteville, AR) as the architects for this project at its meeting on September 22, 2007.


> more

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from preservation consultants to provide services in support of a campus Preservation Master Plan. Written responses will be considered if received by 3:00 PM on Friday, August 10, 2007.

Update: The Board of Trustees selected Ruby Architects, Inc. (Scott, AR), with Lord, Aeck & Sargent (Atlanta, GA) and The Jaeger Company (Gainesville, GA), as the architects and consultants for this project at its meeting on September 22, 2007.

> more
> excerpt from grant application - posted 24 julyX(24mb file)

<empty>
June 8, 2007

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide planning services for a Campus Recreation Center. Written responses will be considered if received by 3:00 PM on Friday, June 22, 2007.

Updates: September 13, 2007 - The committee has notified Cannon Design (St. Louis, MO), in association with Brailsford and Dunlavey (Washington DC), of their selection as the planning consultants for this project.

The selection committee met on Wednesday, August 1, 2007 and selected the teams of
1) Cannon Design (St. Louis, MO), in association with Brailsford and Dunlavey (Washington DC), and
2) Hastings and Chivetta Architects (St. Louis, MO), to provide full proposals. The final selection will be made on the basis of these written proposals.

> more
> additional information - posted 8 june

<empty>
April 20, 2007


NOTICE TO ARCHITECTS
The University of Arkansas Division of Agriculture, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide Architectural services for the Rice Research Facility in Stuttgart, Arkansas. Written responses will be considered if received by 1:00 PM on Friday, May 4, 2007. Note: Interviews for this project will be held in Little Rock, AR.

Update: The Board of Trustees selected Witsell Evans Rasco (Little Rock, AR) as the architects for this project at its meeting on May 25, 2007.

> more

NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Division of Agriculture, in accordance with the policies of the Board of Trustees, is soliciting responses from interested General Contractors to provide professional services for the Rice Research Facility in Stuttgart, Arkansas. Written responses will be considered if received by 1:00 PM on Friday, May 4, 2007. Note: Interviews for this project will be held in Little Rock, AR.

Update: The Board of Trustees selected May Construction (Little Rock, AR) as the general contractor for this project at its meeting on May 25, 2007.

> more

NOTICE TO ARCHITECTS

The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide Architectural Services for the Garland Avenue Parking Garage and Duncan Avenue Footbridge. Written responses will be considered if received by 3:00 PM on Tuesday, May 8, 2007.

Update: The Board of Trustees selected AFHJ Architects (Fayetteville, AR), in association with Herbert Lewis Kruse Blunck (Des Moines, IA) and Walker Parking Consultants (Elgin, IL), as the architects and parking consultants for this project at its meeting on May 25, 2007.

> more
> site location map
> skywalk study (excerpt)

NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested General Contractors to provide professional services for the Garland Avenue Parking Garage and Duncan Avenue Footbridge. Written responses will be considered if received by 3:00 PM on Friday, May 4, 2007.

Update: The Board of Trustees selected Baldwin & Shell (Rogers and Little Rock, AR) as the general contractor for this project at its meeting on September 22, 2007.

> more
> site location map
> skywalk study (excerpt)

<empty>

April 6, 2007

NOTICE TO CIVIL ENGINEERS

The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested Civil Engineers to provide on-call civil engineering services. Written responses will be considered if received by 3:00 PM on Friday, April 20, 2007.

Update: The Board of Trustees selected DCI (Little Rock, AR), CEI (Bentonville, AR), and McClelland Consulting Engineers (Fayetteville, AR) to provide on-call engineering services at its meeting on May 25, 2007.

> more

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide Architectural Services for Phi Delta Theta fraternity. Written responses will be considered if received by 3:00 PM on Friday, April 20, 2007.

Update: The Board of Trustees selected Yeary Lindsey Architects (Little Rock, AR), in association with Heiple + Weidower Architects (Little Rock, AR), as the architects for this project at its meeting on May 25, 2007.

> more
> site location map

<empty>

February 22, 2007

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide Architectural Services for an addition to Ozark Hall, an Auditorium Pavilion, and demolition of the Science Engineering Auditorium. Written responses will be considered if received by 3:00 PM on Monday, March 19, 2007.

Update: The Board of Trustees selected Robert A.M. Stern Architects (New York, NY), in association with Wittenberg Delony & Davidson Architects (Fayetteville and Little Rock, AR), as the architects for this project at its meeting on May 25, 2007.

> more
> site location map

NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested General Contractors to provide professional services for an addition to Ozark Hall, an Auditorium Pavilion, and demolition of the Science Engineering Auditorium. Written responses will be considered if received by 3:00 PM on Monday, March 19, 2007.

Update: The Board of Trustees selected Nabholz Construction (Rogers, AR) as the general contractor for this project at its meeting on May 25, 2007.

> more
> site location map

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide Architectural Services for the remodel of Brough Commons. Written responses will be considered if received by 3:00 PM on Friday, March 9, 2007.

Update: The Board of Trustees selected KSQ Architects (Tulsa, OK), in association with Architecture Plus (Fort Smith, AR), as the architects for this project at its meeting on May 25, 2007.

> more
> site location map

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide Architectural Services for Duncan Avenue Apartments. Written responses will be considered if received by 3:00 PM on Friday, March 9, 2007.

Update: The Board of Trustees selected Little Diversified Architectural Consulting (Charlotte, NC), in association with Allison Architects (Little Rock and Fayetteville, AR), as the architects for this project at its meeting on Friday, April 6, 2007.

> more
> site location map

NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested General Contractors to provide professional services for Duncan Avenue Apartments. Written responses will be considered if received by 3:00 PM on Friday, March 9, 2007.

Update: The Board of Trustees selected Flintco Constructive Solutions (Springdale, AR) as the general contractor for this project at its meeting on Friday, April 6, 2007.

> more
> site location map

<empty>

February 10, 2007

NOTICE TO ARCHITECTS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested firms to provide Architectural Services for Maple Hill Housing, Phase II. Written responses will be considered if received by 3:00 PM on Monday, February 26, 2007.

Update: The Board of Trustees selected Witsell Evans Rasco Architects (Little Rock, AR), in association with Hanbury Evans Wright Vlattas (Norfolk, VA) and AFHJ Architects (Fayetteville, AR), as the architects for this project at its teleconference meeting on March 28, 2007.

> more
> site location map

NOTICE TO GENERAL CONTRACTORS
The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from interested General Contractors to provide professional services for Maple Hill Housing, Phase II. Written responses will be considered if received by 3:00 PM on Monday, February 26, 2007.

Update: The Board of Trustees selected CDI Contractors LTD as the general contractor for this project at its teleconference meeting on March 28, 2007.